Azure cloud, foundations that last

Design, deploy and document a governed Azure environment: landing zones, networking, identities, migrations and high availability, with infrastructure described as code.

A man adjusts a cloud infrastructure connected to a server

When to call us, the most common situations

Starting on Azure

You are opening your first subscriptions and want a clean base: management groups, policies, network and access defined from day one.

Getting back in order

The environment grew without a plan: scattered subscriptions, overly broad rights, resources nobody owns.

Migrating workloads

Applications or on-premises servers to move to Azure, without needless downtime and with a rollback plan.

Getting production-ready

A project is going live and has to hold: high availability, backups, disaster recovery and monitoring.

What you get, in concrete terms

  • Documented landing zone: management groups, subscriptions, naming conventions
  • Hub and spoke networking, Private Endpoints, DNS and documented flows
  • Entra ID and RBAC access model following least privilege
  • Azure Policy for governance and tagging rules
  • Infrastructure as Code (Bicep or Terraform) versioned in your repository
  • Architecture document and runbooks handed to your teams

Tools for this expertise

  • Microsoft Azure
  • Azure DevOps
  • Terraform

How it works, step by step

  1. Scoping

    Current state, goals, security and budget constraints, written success criteria.

  2. Design

    Target architecture and deployment plan, validated with you before anything changes.

  3. Deployment

    Iterative rollout as Infrastructure as Code, on a test environment first, then in production.

  4. Handover

    Documentation, review with your teams and knowledge transfer.

Frequently asked questions, straight answers

Do you work with Bicep or Terraform?

Both. It depends on your context: Bicep for an all-Azure environment, Terraform if you run several clouds or already have modules.

Does everything need to be rebuilt?

No. A landing zone can be introduced gradually next to what exists, and workloads migrated at your pace.

Do you work on environments already in production?

Yes, with planned changes that are tested outside production and reversible.

Who is in control after the engagement?

You are. The code, documentation and access belong to you, and your teams are trained to maintain them.

A project, an overloaded team, an audit? Let's talk.

Reply within two business days, in English, French or Dutch. NDA on request.

[email protected] Send an email